DESIGN VERIFICATIONS

Consolidation of the rock of San Leo

Consolidation of the rock of San Leo

 

Consolidation of the rock of San Leo

Validation verification of the execution design for the completion of the consolidation of the eastern side of the rock of San Leo (RN).

The aim of this project is to prevent and reduce the detachment and fall of material from the rock, which is altered and in poor stability conditions: active defence works are foreseen in order to improve the mechanical resistance of the rock in depth, to limit physical degradation and superficial erosion processes, in addition to the collection of infiltration water, which is clearly present due to the appearance of water along the rock sides.

An inspection proved that the eastern side of the rock of San Leo has several types of fractures, which might lead to detachment of blocks of rock, potentially disastrous for the stability of the rock and related access road, as well as for the people present, local inhabitants or tourists.

The project includes a series of consolidation works on large parts of the rock sides, between the last bend of the road leading to the fortress and the fortress itself: the project strategy is mostly based on deep anchors made of Dywidag bars, steel meshes panels with ropes and nails, as well as detachment, demolition and cleaning operations.

Services provided: Verification for the validation of the execution design.

Client: Region Emilia-Romagna – Regional Agency for Territorial Safety and Civil Protection – Romagna Area Service – Department of Rimini

Year: 2017

Cost of works: 1.6 million Euros

Lifting system from Po Palantone

Lifting system from Po Palantone

 

Lifting system from Po Palantone

Completion works for the planned electro-hydraulic equipment in the Po “Palantone” pumping system in the territory of Salvatonica di Bondeno (FE), belonging to the Emiliano Romagnolo Channel.

Completion works for the planned electro-hydraulic equipment in the Po “Palantone” pumping system in the territory of Salvatonica di Bondeno (FE), belonging to the Emiliano Romagnolo Channel.

In particular, four submerged axial pumps are to be replaced with better performing models, each guaranteeing a flow-rate of 5 cubic metres per second: the project includes the replacement of the existing DN1000 ducts with DN1800 ducts and the adjustment of the intake structures.

Moreover, the geometry of the conveyors to the existing groups supplied by Ansaldo will be modified, in order to make sure the existing pumps can be used even when the Po river water level is low, renouncing to the inverted flow while guaranteeing the cleanliness of the intake structures by means of other cleaning systems.

Concerning the civil works, the main operation is the building of an electric booth for new boards and MT/BT transformers, in addition to a deep internal restructuring of the building where the pumps are hosted, required to make them easier to use.

Part of the existing electrical-instrumental equipment, which is obsolete by now, will be replaced, and some other existing equipment will be replaced or updated and restored, namely suction grids, pumps building inner shutters, outer floodgates.

Services provided: Verification for the validation of the execution design.

Client: Consorzio di Bonifica di II Grado per il Canale Emiliano Romagnolo

Year: 2017

Cost of works: 11.85 million Euros

Municipal Police headquarters in Cervia

Municipal Police headquarters in Cervia

 

Municipal Police headquarters in Cervia

Building of the new Municipal Police headquarters in Via Caduti della Libertà in Cervia – 1st part

The project is the second phase of the general project to make a new office building for the municipality of Cervia. It is required to make the structures hosting municipal activities suitable for the functions they perform.

The new building lies on the north side of the available lot and hosts the Municipal Police headquarters on three floors above ground level, with the possibility of building a further top floor in the future.

The choices of technologies and materials were made in order to achieve a flexible building, capable of adjusting to the various management opportunities.

The frameworks are made of reinforced concrete and have a regular mesh; the outer coating of the building is a brick rainscreen façade in the north and south extremities, and plaster on an outer insulation finishing system in the other parts.

The technological systems, including electrical, air conditioning, data transmission and anti-fire safety systems, were designed in order to privilege renewable energy sources.

Services provided: Verification for the validation of the execution design.

Client: Municipality of Cervia (RA)

Year: 2014

Cost of works: 2.5 million Euros

Spagnoli Tower in Carpi

Spagnoli Tower in Carpi

 

Spagnoli Tower in Carpi

Restoration and conservative renewal works, including seismic enhancement, of the “Spagnoli Tower” in Carpi, damaged by the earthquake of May 2012, 1st part.

The Tower, which was erected in the 14th century, lies in the south-western corner of Palazzo dei Pio, in the historical centre of Carpi. It is a separate and autonomous building, though it is directly connected with the place on the first floor. Watching the complex from the square, the Tower façade, not aligned with the rest of the building, clearly stands out, both for its size and its formal characteristics.

The building occupies four rectangular floors, and its façades have different numbers and types of windows, which prove the deep changes the building has gone through: the only element which confers some sort of uniformity to it is the alternation of niches and windows under the eaves, made in the first few decades of the 18th century.

The project undergoing verification includes a series of structural and architectural works, excluding the systems, the building finishes and the restoration of the decorative paintings, included in a second lot.

The project aims to consolidate all the structures, both vertical and horizontal, refit the underground floor, complete the finishes of the outer walls by installing doors and windows and construct a new underground thermal station in the courtyard, next to the existing anti-fire basin.

Services provided: Verification for the validation of the execution design.

Client: Municipality of Carpi (MO)

Year: 2017

Cost of works: 2.89 million Euros

Reorganization of the Conca water system

Reorganization of the Conca water system

 

Reorganization of the Conca water system

Reorganization of the Conca water system, within the framework of theRomagna Waterworks: lot 1 – adduction works and lot 2 – distribution works.

The project includes the installation of a new DN500 duct deviating from the low coast line of the Romagna Waterworks as far as the new node booth in the territory of Ordoncione: the pipe is made of spherical connection steel pipes, with extruded polyethylene outer coating and bi-component epoxy resin inner lining.

The A14 motorway will be crossed by means of the microtunnelling technique and using a reinforced concrete protective pipe of inner diameter 1 metre and length 95 metres.

The new Ordoncione booth is on two levels, one of which underground, and hosts the hydraulic and electrical-instrumental equipment required to regulate the waterworks: the structure includes cast-in-situ reinforced concrete beams, partitions and slabs.

The distribution works envisage the installation of a DN600 steel pipe from the Montalbano reservoir control room: next to Via Emilia Romagna, the pipe connects with the existing DN600 pipe, which already has a deviation pit, then it goes on with DN500 steel pipes until it reaches the interconnection pit with the existing distribution network.

A further ductile cast iron DN300 pipe also starts from the deviation pit, feeding the Misano Adriatico distribution network.

Services provided: Verification for the validation of the execution design.

Client: Romagna Acque Società delle Fonti S.p.A.

Year: 2014

Cost of works: 910,000 Euros for lot 1 and 950,000 Euros for lot 2

Irrigation duct for the plain in the north of the province of Bologna

Irrigation duct for the plain in the north of the province of Bologna

 

Irrigation duct for the plain in the north of the province of Bologna

Extension of the Emiliano Romagnolo Channel primary adduction duct to feed the water system of the plain in the north of the province of Bologna, on the left banks of the river Reno.

The project aims to complete the irrigation adduction infrastructure, already partially built, in order to make it possible to collect water from the river Po, at Bentivoglio, and to transport it to large areas of the plain in the north of the province of Bologna, today scarcely and not stably served.

The project envisages the following works:

  • Installation of a DN1200 ductile cast iron underground duct of total length 3,900 metres, for the main adduction line;
  • Realizing a pipe bridge crossing the river Reno, of length 350 metres, with steel reticular structure, with reinforced concrete foundations, piers and abutments;
  • Installation of DN500 and DN250 ductile cast iron underground pipes, for a total length of 1100 metres, for the secondary lines feeding the irrigation channels;
  • Realizing structures servicing the adduction lines.

Services provided: Verification for the validation of the execution design.

Client: CONSORZIO della BONIFICA RENANA

Year: 2017

Cost of works: 8.56 million Euros

Irrigation distribution system of Laghetto (BO)

Irrigation distribution system of Laghetto (BO)

 

Irrigation distribution system of Laghetto (BO)

Building of a reservoir and a distribution network connected with the Laghetto drain.

The project envisages the realization of an irrigation 100,000 cubic metres reservoir and related distribution network, partially made of ducts and partially of channels, aiming to provide the Laghetto-drain district with a larger amount of water for irrigation.

The project includes the following works:

  • Waterproofing of the bottom and banks of the reservoir using a high density polyethylene geo-membrane;
  • Groundwater table draining system to safeguard the stability of the reservoir bottom and banks;
  • Deviation dam in the bed of the Laghetto drain, made of reinforced concrete, with adjustment of the hydrostatic head by means of a mobile metal threshold controlled by local automatic device.
  • Reservoir loading structure including a loading tunnel and an underground chamber, hosting the submersible pumps, with flow-rates 90 litres per second at hydrostatic head of 6.8 metres of water column;
  • Discharge mechanism in case of excessive filling, to ensure hydraulic safety;
  • Sampling device with measurement and DN500 HPDE underground adduction pipe.
  • Structures reaching out consumers.

Services provided: Verification for the validation of the execution design.

Client: Consorzio della Bonifica RENANA

Year: 2017

Cost of works: 1.47 million Euros

Restoration of the first adduction branch of the CER

Restoration of the first adduction branch of the CER

 

Restoration of the first adduction branch of the CER

Operations and works to stabilize and restore the efficiency of the first adduction branch of the Emiliano Romagnolo Channel (CER), in the Reno – Crevenzosa area.

The project aims to solve a series of problems due to the instability of the riversides, reduced flow-rates, abnormal energy consumption and remarkable maintenance difficulties which, if not promptly solved, may entail the interruption of the whole Emiliano Romagnolo Channel system.

Concerning the costs of project, the client, Consorzio di secondo grado per il CER, has privileged a “phase by phase” approach; this phase concerns the part of the infrastructure most commonly affected by landslides, for a total length of 2,740 metres in the municipality of Galliera (BO), between the exit of the river Reno underpass and the Via Coronella provincial road, close to the Crevenzosa lifting system.

The project envisages the following works:

  • Lowering the banks to the countryside level and outlining them;
  • Full remake of the cover slabs with a new edge geometry, with a single slope, intermediate between the two currently used, so that it will be possible to produce the slabs using a dedicated channel bed paving machine;
  • Reconstruction of the collapsed banks according to the new geometry, realizing an access ramp to the channel bed for future maintenance operations.

Services provided: Verification for the validation of the execution design.

Client: Consorzio di Bonifica di II Grado per il Canale Emiliano Romagnolo

Year: 2017

Cost of works: 5.2 million Euros

CER floodgates in Sant’Agostino and Crevenzosa

CER floodgates in Sant’Agostino and Crevenzosa

CER floodgates in Sant’Agostino and Crevenzosa

Construction and installation of metal floodgates along the main branch of the Emiliano Romagnolo Channel at the Sant’Agostino and Crevenzosa plants.

The project aims to enhance the hydraulic safety of the Emiliano Romagnolo Channel. It envisages:

  • Realizing three new metal floodgates to be installed near the deviation drain of Sant’Agostino di Ferrara, including the related civil works;
  • Realizing a new floodgate discharging into the Crevenzosa plant feed basin.

The floodgates at the Sant’Agostino plant is adequate to support an hydrostatic head of 6 metres, to move under an hydrostatic head of 3 metres, whereas the Crevenzosa floodgate is adequate to support an hydrostatic head of 7 metres.

Losses when the floodgate is closed may be limited to 0.02 litres per second per linear metre of wet perimeter.

Services provided: Verification for the validation of the execution design.

Client: Consorzio di Bonifica di II Grado per il Canale Emiliano Romagnolo

Year: 2017

Cost of works: 480,000 Euros

Sistema di distribuzione irrigua Ciarle(FE)

Sistema di distribuzione irrigua Ciarle(FE)

 

Ciarle irrigation distribution system

Primary implementation of the Ciarle irrigation system, in the municipalities of Poggio Renatico and Terre del Reno (FE): 

southern distribution duct and pumpin system

The project foresees the works required to convey and keep irrigation water in the existing drain canal network in a zone within the territory of the consortium, covering an area of 5,586 hectares, including a part of the territory of the municipality of Poggio Renatico.

The works include the completion and adjustment of the irrigation water deviation and pumping plant from the Emiliano Romagnolo Channel (CER) on the right banks of the river Reno, located at the bridge of Via Ciarle, in the municipality of Terre del Reno, up-stream the barrel-shaped crossing of the river Reno, and the completion and adjustment of the Southern Distribution Duct.

The water off-taken and lifted by the plant is transported to the distribution network through a dedicated irrigation duct mostly running on the surface, following the morphological humps due to the ancient and the current beds of the river Reno; the duct feeds the consortium drain channels from the beginning, crossing them where they start.

The amount of water collected from the CER for the southern duct is estimated to be 1,675 litres per second, corresponding to an average of 0.3 l/s per hectare.

The Ciarle deviation and pumping plant is equipped with three submersible pumps located inside a dedicate underground basin, each of capacity 1,000 litres per second, with a geodetic head of 3÷4 metres.

Services provided: Verification for the validation of the execution design.

Client: CONSORZIO di BONIFICA Pianura di Ferrara

Year: 2017

Cost of works: 6.03 million Euros

v