Steel penstock of inner diameter 2250 mm and thickness 58 mm, in a sub-horizontal tunnel, with blocked vertices without movement joints and intermediate pin supports. Length of approximately 245 m with a hydraulic drop of about 920 m. The pipe originates from an initial branch connecting to the existing pipe, blocked inside rock, which gradually passes from the existing penstock of inner diameter 2550 mm to the new pipe of inner diameter 2250 mm.

Read More

University Campus in the area of former Morgagni Hospital of Forlì – new Teaching Hub consisting of a connection “strand” and classroom structures. Work management and variations appraisal, in a temporary joint venture with architect Lamberto Rossi of Milan.

Read More

Junction between Via dei Cosmonauti, Strada Statale n. 16 Adriatica and ex S.S. 71 bis by realizing a new road junction at different levels, with underpass of the Ravenna-Rimini railway line by means of an hydraulic-driven box-shaped structure. Work management and safety coordination.

Read More

New potable-water treatment plant in the territory of Standiana (RA), to complete the conjunction works between the Romagna Waterworks and the water plants of the Ravenna area. Safety coordination is being implemented.

Read More

WORK PLANNING AND MANAGEMENT

SAFETY
.

DESIGN
VERIFICATION

TESTS
.

HYDRAULIC
MODELS